Kerb production, transport and installation
Production, transport and installation of 665 m of kerbs.

About the project
Production of concrete kerbs, transport to the construction site and installation. ATEA's post states a total of 665 m. The photograph shows installed kerbs along the street and the prepared subbase between them.
Gallery
More photographs will be added to the gallery.
PROJECTS ON THE MAP Work locations
City markers are approximate, not exact construction-site locations. Project pins appear only when coordinates have been entered.
Map: Natural Earth 1:10m (public domain) · Cities: GeoNames, CC BY 4.0